We worked alongside the client’s direct suppliers to ensure that the ‘Grand Opening’ of a new build factory was completed on time.

The use of a raised GRP flooring allowed the chemicals used in the etching process to run down to the built-in commercial sump pump. This was made possible through the installation of an in situ angled concrete slab.

The build was on the site of the current factory so we had to ensure that our deliveries and site team were all inducted to suit the client’s times and specific requirements.

DURATION:

19 weeks

VALUE

£900,000